Production planning (MRP), routing & work centers: how it works

Planning works out what to make and what to buy: open sales orders, accepted quotations, open production orders and reorder points minus stock and what is already coming. Recipes can use sub-assemblies with their own recipes, carry a routing of steps at work centers with set-up and run minutes, and production records step times and scrap.

Lesson 4 of 10 · How it works

  • about 3 min
  • Production → Planning (MRP)

How it works

  1. «Planning (MRP)» → «Run planning» with a horizon in days. Products with a recipe are planned in whole batches and their components become demand one level down; the rest becomes purchase suggestions with the preferred supplier and the last price.

  2. Each suggestion shows why (sales order, quotation, production order, planned parent, Reorder point The smallest quantity of a product you want to keep. When stock falls to this number or below, the product is listed as running low. More words in the glossary). Tick them and «Create draft orders»: draft production orders with the due date, and one draft purchase order per supplier — nothing is sent.

  3. «Work centers» lists machines, benches and lines with cost per hour and hours per day, and the open load in minutes and working days.

  4. On a recipe, «Routing (work centers & times)» lists the steps with set-up minutes once per order and run minutes per Batch A group of the same product that arrived together, with its own batch number and, if needed, an expiry date. More words in the glossary; every new production order copies them as steps.

  5. On the production order, «Start step» and «Finish step» record actual minutes (measured or typed), good and scrapped quantity; the order completes when every step is done or skipped.

  6. «Make the short sub-assemblies first» creates linked production orders for components that have their own recipe and are short, due a day before the parent. «Multi-level structure» shows what one batch needs down to the last level.

Where to find it

Settings that change it

Checklist

Before you move on, check that you can:

  • Open Production → Planning (MRP)
  • Planning (MRP) → Run planning with a horizon in days.
  • Each suggestion shows why (sales order, quotation, production order, planned parent, reorder point).
  • Work centers lists machines, benches and lines with cost per hour and hours per day, and the open load in…
  • On a recipe, Routing (work centers & times) lists the steps with set-up minutes once per order and run…

Tips and common mistakes

  • Reorder points (minimum quantity per location) act as safety stock in planning — set them on the stock page for bought parts.
  • Draft purchase orders count as coming supply, so a second run does not suggest the same purchase again; cancel drafts you do not need.
  • A recipe that uses itself through its components is refused with the loop named.